Case Study


Rochester Bridge Repair

Project Details

Detailed corrosion survey carried out, to access the extent of repair.

Bridge shot blasted to SA2.5 standard.

Survey of steel work repairs and drawings prepared for approval.

All vegetation removed around repair areas.

Brick work repaired as necessary.

4 Services provided by HRS rail.

Rail, Civils, Maintenance, Surveying and Engineering.

Call HRS Rail

Call Us Now on 01797 329 421

Accreditations