Case Study


Land Slip

Emergency land slip call out to stabilise with temporary works.

Initial Emergeny Work

HRS rail were called out to deal with an embankment land slip site due to bad weather. On an emergency night time block, our team stabilised the bank with temporary works and cleared the site to enable services to run.

Further Remedial Work

After the PC had gone through the design and tender stage, HRS rail were awarded the remedial works.

These works included installing a gabion basket wall and landfill to the cutting.

Works included, major excavation – approximately 800 T of spoil was removed from the cutting to stabilise the embankment whilst the works were under taken.

A gabion wall was formed with 500T of gabion stone all hand picked and laid.

2180 T of back fill stone was laid and compacted on the embankment.

Demob works included.

Call HRS Rail

Call Us Now on 01797 329 421

Accreditations