Case Study


Lorry Bridge Strike

Project Details

We were called to out to complete this job due to a lorry driver striking the front of the bridge structure and damaging the chevrons and frame attached.

We mobilised our team to carry out a site survey and manufactured a replacement with 2 days, our insulation team attended site at the agree possession time with the PC and carried out the repair in one 12 hour shift.

The job was completed on time and within budget.