Case Study


Bearing Stall to Bridge Repair

Project Details

Reported noise from above track when train passing over, on inspection bearing stall area badly corroded and movement observed between bridge and bearing stall.

Action Taken

Detail survey carried out and drawings submitted for approval, fabrication of steelwork carried out and installed within 1 week of original defect being reported.

Call HRS Rail

Call Us Now on 01797 329 421

Accreditations